Type of document: Contract Notice
Country: United Kingdom
1. Title: REFURBISHMENT AND RECONFIGURATION WORKS
2. Awarding Authority: Mid and West Wales Fire and Rescue Authority, Procurement Department , Fire Service Headquarters, Lime Grove Avenue, Carmarthen, GB, SA31 1SP. Tel: 03706060699. Fax: 01267220562.. Web: (David Williams)
3. Contract type: Public works contract
Single stage
4. Description: Refurbishment and reconfiguration works to the Specified Location. Comprehensive information can be found in the documents uploaded to the Additional Documents area.
5. CPV Code(s): 45210000, 45216000, 45216100, 45216120, 45262700, 45262800, 45300000, 45400000, 79993000
6. NUTS code(s): UKL, UKL2, UKL24
7. Main site or location of works, main place of delivery or main place of performance: Machynlleth Fire Station
Powys
8. Reference attributed by awarding authority: OCID: ocds-kuma6s-142217
Reference number attributed to the notice by the contracting authority
MWT36
(WA Ref:142217)
9. Estimated value of requirement: Not provided.
10. Time-limit for receipt of completed tenders 24.7.2024 (12:00).
11. Address to which they must be sent: For further information regarding the above contract notice please visit:
12. Other information: NOTE: To register your interest in this notice and obtain any additional information please visit the Sell2Wales Web Site at
The buyer has indicated that it will accept electronic responses to this notice via the Postbox facility. A user guide is available at
Suppliers are advised to allow adequate time for uploading documents and to dispatch the electronic response well in advance of the closing time to avoid any last minute problems.
Estimated award date: 23-09-2024
Language or languages in which tenders or requests to participate can be drawn up
EN CY
Tender Submission Postbox
The buyer has indicated that it will accept electronic responses to this notice via the Postbox facility. A user guide is available at
Additional Documentation
The following additional documents relating to this notice are available from the site:
Appendix-A-SPD-Questionnaire
Appendix-B1-19658-MFS-LAW-X-X-SP-A-000001 – Specification 2024-05-29
Appendix-B2-MFS-LAW-X-00-DR-A-031001_T5-EXISTING GROUND FLOOR PLAN
Appendix-B3-MFS-LAW-X-00-DR-A-031002_T4-EXISTING ROOF PLAN
Appendix-B4-MFS-LAW-X-00-DR-A-041001_T8-DEMOLITION GROUND FLOOR PLAN
Appendix-B5-MFS-LAW-X-00-DR-A-061001_T8-PROPOSED GROUND FLOOR PLAN
Appendix-B6-MFS-LAW-X-00-DR-A-061002_T7-PROPOSED ROOF PLAN
Appendix-B7-MFS-LAW-X-X-DR-A-011001_T9-Drawing Transmittal Sheet
Appendix-B8-MFS-LAW-X-X-DR-A-032001_T5-EXISTING ELEVATIONS
Appendix-B9-MFS-LAW-X-X-DR-A-039001_T4-EXISTING SITE PLAN
Appendix-B10-MFS-LAW-X-X-DR-A-042001_T6-DEMOLITION ELEVATIONS
Appendix-B11-MFS-LAW-X-X-DR-A-051001_T8-ACCESS & FIRE STRATEGY
Appendix-B12-MFS-LAW-X-X-DR-A-062001_T8-PROPOSED ELEVATIONS
Appendix-B13-MFS-LAW-X-X-DR-A-063001_T7-PROPOSED SECTIONS
Appendix-B14-MFS-LAW-X-X-DR-A-065001_T7-PROPOSED CEILING PLAN
Appendix-B15-MFS-LAW-X-X-DR-A-069001_T7-PROPOSED SITE PLAN
Appendix-B16-MFS-LAW-X-X-DR-A-069002_T3-CONSTRAINTS PLAN
Appendix-B17-MFS-LAW-X-X-DR-A-092001_T1-PROPOSED PHASING
Appendix-B18-MFS-LAW-X-X-DR-A-095001_T4-CDM RISK REGISTER
Appendix-B19-MFS-LAW-X-X-DR-A-210001_T3-TYPICAL EXTERNAL WALL APERTURE DETAILS
Appendix-B20-MFS-LAW-X-X-DR-A-220001_T3-INTERNAL PARTITION DETAILS
Appendix-B21-MFS-LAW-X-X-DR-A-240001_T3-RAMP DETAILS (1)
Appendix-B22-MFS-LAW-X-X-DR-A-270002_T3-TYPICAL ROOF DETAILS – PROPOSED ROOF
Appendix-B23-MFS-LAW-X-X-DR-A-400001_T8-FINISHES & SETTING OUT PLAN
Appendix-B24-MFS-LAW-X-X-DR-A-730001_T7-TEAPOINT DETAILS
Appendix-B25-MFS-LAW-X-X-DR-A-730002_T1-FF&E DETAILS
Appendix-B26-MFS-LAW-X-X-DR-A-740001_T7-SANITARY DETAILS 01
Appendix-B27-MFS-LAW-X-X-DR-A-740002_T7-SANITARY DETAILS 02
Appendix-B28-MFS-LAW-X-X-SH-A-314001_T6-WINDOW SCHEDULE (1)
Appendix-B29-MFS-LAW-X-X-SH-A-315001_T5-EXTERNAL DOOR SCHEDULE
Appendix-B30-MFS-LAW-X-X-SH-A-325001_T6-INTERNAL DOOR SCHEDULE
Appendix-B31-2917 – Document Issue Sheet
Appendix-B32-2917-CWC-XX-00-DR-E-6201
Appendix-B33-2917-CWC-XX-00-DR-E-6301
Appendix-B34-2917-CWC-XX-00-DR-E-6501
Appendix-B35-2917-CWC-XX-00-DR-M-5201
Appendix-B36-2917-CWC-XX-00-DR-M-5301
Appendix-B37-2917-CWC-XX-00-DR-M-5601
Appendix-B38-2917-CWC-XX-00-DR-M-5701
Appendix-B39-2917-CWC-XX-00-DR-ME-5001
Appendix-B40-2917-CWC-XX-01-DR-E-6502
Appendix-B41-2917-CWC-XX-EX-DR-E-9001
Appendix-B42-2917-CWC-XX-R1-DR-M-5001
Appendix-B43-2917-CWC-XX-SP-E-0001 T2
Appendix-B44-2917-CWC-XX-SP-M-5001 T1
Appendix-B45-2917-CWC-XX-SP-N-0001 T2
Appendix-B46-2917-CWC-XX-XX-SC-E-6001
Appendix-B47-2917-CWC-XX-XX-SH-M-5301_T1
Appendix-B48-2917-CWC-XX-XX-SH-M-5601_T1
Appendix-B49-2917-CWC-XX-XX-SH-M-5602_T1
Appendix-B50-2917-CWC-XX-XX-SH-M-5603_T1
Appendix-B51-2917-CWC-XX-XX-SH-M-5701_T1
Appendix-B52-2917-CWC-XX-ZZ-DR-ME-4001
Appendix-B53-2917-CWC-XX-ZZ-SC-M-5001
Appendix-B54-2971-CWC-XX-00-DR-E-6701
Appendix-B55-Stage 4 DB Schedules
Appendix-B56-Bat Survey Report
Appendix-B57-Energy_Networks
Appendix-B58-PCI
Appendix-B59-R&D
Appendix-B60-Utilities Plan
Appendix-B61-Welfare
Appendix-B62-MFS-ENA-XX-XX-DR-C-3001
Appendix-B63-MFS-ENA-XX-XX-DR-C-3002
Appendix-B64-MFS-ENA-XX-XX-DR-C-5100
Appendix-B65-MFS-ENA-XX-XX-DR-S-0000
Appendix-B66-MFS-ENA-XX-XX-DR-S-0001
Appendix-B67-MFS-ENA-XX-XX-DR-S-0002
Appendix-B68-MFS-ENA-XX-XX-DR-S-0003
Appendix-B69-MFS-ENA-XX-XX-DR-S-0004
Appendix-B70-MFS-ENA-XX-XX-SC-S-0001
Appendix-B71-MFS-ENA-XX-XX-SC-S-0002
Appendix-C-Pricing-Schedule
Appendix-D-Employers-Preliminaries
Appendix-E-Named-Roofing-Contractors
Appendix-F-Statement for Site Operation during Construction
Appendix-G-Welsh-Language-Standards-Questionnaire
ITT-Part-1-Machynlleth Project 2024
ITT-Part-2-Machynlleth-Project-2024
TKR-2024619-EX-1753685