1. Title: BUILDING CONSTRUCTION – EXPORTING OPPORTUNITY
2. Awarding Authority: Secretary of State for Business, Innovation & Skills acting on behalf of UK Trade & Investment (UKTI), GB. Web:
3. Contract type: Public works contract
4. Description: Opportunity type Public Sector
Industry Advanced engineering, Construction, Water
The government of Jamaica invites bids for the renovation and upgrading at Jamaica Post locations.
This project involves the retrofitting the space to house NIDS offices and service centre, including
erect reinforced concrete walling
roofing
floor finishes
ceiling finishes
installation of windows and doors
installation of drywall partitioning
sanitary fixtures
plumbing
heating, ventilation, and air conditioning (HVAC) installation
electrical and fire protection systems
camera and access control systems
procurement and installation of specified furniture
Half Way Tree Post Office
Scope of requirements
This specification requirement covers all the requirements that will be needed to inform the supplier/vendor/manufacturer to carry out what is expected from them.
The contract will be awarded as a turnkey project and the contractor will be responsible for all the work specified. This specification states the minimum requirements relating to the work and in no way absolves the contractor from responsibility for sound engineering practice.
Any omissions or sub-standard requirements of this specification must be brought to the attention of the client at tender stage and optional prices for addressing such omissions must be provided.
Working hours
Normal working hours shall apply of Monday to Friday, from 8am to 5pm.
Note however, that the contractor may be required to work at nights and on weekends in some instances, where the nature of work would affect Post Office operations during normal working hours. This should be taken into account and priced in the rates submitted.
Scope of work
The scope consists of modification and retrofitting of 4 20’ containers hoisted and placed on reinforced concrete plinths. All associated excavation and earthworks are to be executed under the contract to include site infrastructure works (drainage ramps, steps).
The work includes:
drywall partitioning
roofing
finishes to interior and exterior surfaces
ceiling finishes
windows and doors
sanitary fixtures
plumbing
HVAC installation
electrical and fire protection systems
camera
access control
The installation of specified furniture is also included. Upon completion the building will be equipped with three enrolment offices, a customer service area, comms room, rest room, and an outdoor eating and waiting area. Renovation works will also be carried out on the Post Office Building to include construction of lunch room and bathroom facilities.
Constant Spring Post Office
Scope of requirements
This specification requirement covers all the requirements that will be needed to inform the supplier/vendor/manufacturer to carry out what is expected from them.
The contract will be awarded as a turnkey project and the contractor will be responsible for all the work specified. This specification states the minimum requirements relating to the work and in no way absolves the contractor from responsibility for sound engineering practice.
Any omissions or sub-standard requirements of this specification must be brought to the attention of the client at tender stage and optional prices for addressing such omissions must be provided.
Working hours
Normal working hours shall apply of Monday to Friday, from 8am to 5pm.
Note however, that the contractor may be required to work at nights and on weekends in some instances, where the nature of work would affect Post Office operations during normal working hours. This should be taken into account and priced in the rates submitted.
Scope of work
The scope consists of the construction of an outstation for NIDS adjoining the right side of the Post Office. This space will include:
4 cubicles
bathrooms
comms room
a customer service area.
The work includes:
retrofitting of an area of the existing building
construction of reinforced concrete block walls
installation of drywall partitioning
construction of floor
walls and ceiling finishes
windows and doors
sanitary fixtures
plumbing
HVAC installation
electrical and fire protection systems
camera
access control
The installation of specified furniture is also included.
Mona Post Office
Scope of requirements
This specification requirement covers all the requirements that will be needed to inform the supplier/vendor/manufacturer to carry out what is expected from them.
The contract will be awarded as a turnkey project and the contractor will be responsible for all the work specified. This specification states the minimum requirements relating to the work and in no way absolves the contractor from responsibility for sound engineering practice.
Any omissions or sub-standard requirements of this specification must be brought to the attention of the client at tender stage and optional prices for addressing such omissions must be provided.
Working hours
Normal working hours shall apply of Monday to Friday from 8am to 5pm.
Note however, that the contractor may be required to work at nights and on weekends in some instances, where the nature of work would affect Post Office operations during normal working hours. This should be taken into account and priced in the rates submitted.
Scope of work
The scope consists of the construction of an outstation for NIDS adjoining the Post Office. This space will include:
5 cubicles
bathrooms
comms room
a customer service area
The work includes:
demolition and carting away of the left wing of the Post Office
construction of reinforced concrete block walls
installation of drywall partitioning
construction of floor
walls and ceiling finishes
windows and doors
sanitary fixtures
plumbing
HVAC installation
electrical and fire protection systems
camera
access control
rehabilitation of parking lot
The installation of specified furniture is also included.
5. CPV Code(s): 45000000, 45210000, 45260000, 45421146, 45420000, 45421130, 45232460, 45330000, 45331000, 42961100
6. NUTS code(s): UKC, UKD, UKE, UKF, UKG, UKH, UKI, UKJ, UKK, UKL, UKM, UKN
7. Main site or location of works, main place of delivery or main place of performance: Jamaica
8. Reference attributed by awarding authority: Not provided.
9. Estimated value of requirement: Not provided.
10. Opportunity closing date 11.12.2023.
11. Address to which they must be sent: To register your interest in the above opportunity please visit:
12. Other information: TKR-20231115-EX-1653434

RELATED ARTICLES

April 27, 2026

P1144 - Response Maintenance and Improvement

Type of document: Contract Notice Country: United Kingdom 1. Title: P1144 – RESPONSE MAINTENANCE AND IMPROVEMENT 2. Awarding Authority: Northern Ireland Housing Executive,

April 27, 2026

P-1067 - CCTV and Door Entry System Upgrades - Hertford Crescent, Beechland Drive, Ashlea Place and Rowan Drive

Type of document: Contract Notice Country: United Kingdom 1. Title: P-1067 – CCTV AND DOOR ENTRY SYSTEM UPGRADES – HERTFORD CRESCENT, BEECHLAND