CONNECTING THE DEFENCE COMMUNITY WITH INSIGHT, INTELLIGENCE & OPPORTUNITIES

Officially Supported By:   Supply2Defence

Official Media Partners for:

The current contract for Riverbank protection works in Solihull is projected to end on 23/3/2017 and may be available for re-tender.The current contract for Riverbank protection works in Solihull included Channel and defence maintenance activities. The control of aquatic weed across the channel, managing vegetation growth on the channel, desilting activities, raised embankment maintenance and blockage removal. The contractor will be given a maintenance regime for each sub reach along the length of the watercourse. The regime will relate to the environmental options and ensure the balance between the need of channel conveyance and the needs of the environment.2. Incident Response. The contractors must have the capability to provide incident response. Specifically, contractors will provide operational staff to assist the Environment Agency in responding to flood events. Incident response activities will include 24 hour standby arrangements, deployment of labour during flood incidents, monitoring assets, operating assets and carrying out emergency repairs and emergency blockage removals.3. Operational Inspections. Visual inspections of operational structures, defences and channels to be carried out by the contractor to ensure they remain at the required standard. Inspections may include removal of debris or obstructions during site visits.4. Minor Asset Repairs. Improvements to existing structures. This will include minor building maintenance, minor masonry and concrete repairs, repair and maintenance of access tracks, and health and safety control measures. Structures vary in size from small flapped outfalls to pumping stations. However, repair works would typically be below 500 GBP in value per task.The contracts will be based on specific geographical areas throughout the region and suppliers will be managed by local area staff specific to the area they are working in. The framework will be governed by the NEC Term Service Contract terms and conditions.

RELATED ARTICLES

February 24, 2025

Pipeline Framework: Service & Maintenance of Fire Alarms

A pipeline has been launched for Service & Maintenance of Fire Alarms.The contract start Date is 1 August 2025.

February 21, 2025

Pipeline Framework: The Provision of Grounds Maintenance Services

A pipeline has been launched for The Provision of Grounds Maintenance Services.The contract start Date is 1 January 2026.